Articles & Projects
Discover more articles from Profilitec S.p.A.
Bordertec BBS
Bordertec BBS
New product: Plano PPS130 skirting board
New product: Plano PPS130 skirting board
SANITEC SB UPDATE
SANITEC SB UPDATE
Latest News
 CE Marking and DoP: A Guide to Fire-Resistant Doors and Windows Compliance
Glassfire
CE Marking and DoP: A Guide to Fire-Resistant Doors and Windows Compliance
MES STUDIO 327 | DENTAL SURGERY
Ermetika s.r.l.
MES STUDIO 327 | DENTAL SURGERY
The light point takes center stage with Whitek 44:  axial controls and ultra-slim Easy Smart 44 cover plates.
Ave S.p.a.
The light point takes center stage with Whitek 44: axial controls and ultra-slim Easy Smart 44 cover plates.
Profilitec S.p.A.
Profilitec S.p.A.
Has published an article on 29/10/2021
A RAISED FLOOR RESISTANT TO LOW TEMPERATURES

We are in Salt Lake City, the state capital of Utah. The project was a renovation of a terrace of the Century Building. They decided to go for  a raised floor installation on pedestals to avoid possible problems due to low winter temperatures.


The best solution was to use Uptec pedestal system  to avoid the problems of classic bonded installation.

In particular, there were two advantages: 
1) faster installation without the use of mortar 
2) easy water drainage

The result was appreciated by the client, who wanted a resistant and aesthetically harmonious terrace, creating a pleasant and contemporary environment.

Discover UPTEC and use it into your next project. 

Profilitec 

A RAISED FLOOR RESISTANT TO LOW TEMPERATURES